5
Testing the Power Path
1. Turn off power supply.
2. Remove 4 screws to remove cover and hang cover from venting with “S” hooks provided in kit.
Do not disconnect ribbon wire.
3. Turn on power supply.
4. Use multimeter set on AC volts up to at least 250 VAC to test between L & M (All results should
be +/- 10%).
Results=220V?
YES
NO
Unitreceivingpower–continuetesting.
Havequalifiedelectricianrewirechlorinatorto
220Vordetermine
whynovoltage.
Resetorreplace
circuitbreaker.
(see Circuit Breaker pg. 4)
Transformerreceivingpower
circuitbreakerOK(continuetesting).
6.TestbetweenN&K=220V?
YES NO
7.TestbetweenH&FandH&D.
Resultsshouldbeasprinted
ontransformer(26.5V).
BothtestsreadOK?
YES NO
Transformerisgood.
Replacetransformer.
(see Transformer pg. 9)
A B C D E F G H I J N K L M