Edition 2 Chapter 3 Page 3-24
Feb/2013 Inspection [document code]
Table 3-1 Maintenance Checklist
DAILY (8 HOURS)
Do daily lubrication tasks
Drain the air reservoir of moisture
Examine the hydraulic reservoir fluid
level
Examine the wire-ropes and related
components
Fill fuel tank
Examine the air cleaner, the air intake
pipelines and clamps
Examine engine oil level
Inspect the controls
Examine coolant level
Examine instruments, gauges and safety
equipment
Examine hydraulic cylinder mounting
bushings and pins
Make overall visual inspection
Examine hydraulic components
Examine the torque of swing bearing bolts*
Examine transmission oil level
Examine the torque of wheel nuts for the first
300 km*
Examine lockout system of front and
rear axles
Examine anti-two block system
Drain the fuel filters or water separator
Examine Engine Manufacturer’s Manual for
more maintenance requirements
Examine boom front slider pads
Make sure that the swing brake is able to hold
against the full torque of the swing motor
WEEKLY (40 HOURS)
Do the daily check
Examine the wire-ropes
Do the weekly lubrication
Replace the hydraulic return line filter*
Examine the level of oil in the swing
motor
Visually examine all structural members and
welds for cracks, alignment and wear
Do an initial axle oil change
Examine the boom for wear, cracked welds,
alignment and missing or illegible decals