EasyManua.ls Logo

3M 40800 - Unpacking; Uncrating

3M 40800
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
6.1 Uncrating
The envelope attached to the shipping box contains
the uncrating instructions of the machine (Figure 6-1).
Cut straps. Cut out staple positions along the bottom
of the shipping box (or remove staples with an
appropriate tool) Figure 6-2).
After cutting out or removing the staples, lift the
shipping box in order to clear the machine
(two persons required).
Transport the machine with a fork-lift truck to the op-
erating position. Lift the pallet at the point indicated in
Figure 6-3 (weight of machine + pallet = 225 kg).
2010 January
700rks-NA
6-UNPACKING
6.2 Disposal of Packaging Materials
The 700rks-NA package is composed of:
- Wooden pallet
- Cardboard shipping box
- Wooden supports
- Metal xing brackets
- PU foam protection
- PP plastic straps
- Dehydrating salts in bag
- Special bag of laminated polyester/aluminium/
- Polyethylene (sea freight package only)
- Polyethylene protective material
For the disposal of the above materials, please follow
the environmental directives or the law in your country.
Figure 6-1
Figure 6-2
Figure 6-5
Figure 6-3
Removal of Pallet
Loosen and remove nuts and brackets using the
open end spanner supplied in the tool box (Figure 6-4).
A cardboard box is located under the machine body.
Retrieve the instruction manual for additional proce-
dures of the set up. The box also contains parts re-
moved for shipping, spare parts and tools (Figure 6-5).
Figure 6-4

Table of Contents

Related product manuals