WH Series Startup Form
Job Name:_______________________________________________
Date:______________
Address:______________________________________________________________________
______________________________________________________________________________
Model Number:_________________________________________________________________
Serial Number:_____________________________________________
Startup Contractor:______________________________________________________________
Address:______________________________________________________________________
_______________________________________________________
Pre Startup Checklist
Installing contractor must verify the following items.
1. Is there any visible shipping damage?
3. Are the unit clearances adequate for service and operation?
4. Have all electrical connections been tested for tightness?
5. Does the electrical service correspond to the unit nameplate?
6. On 208/230V units, has transformer tap been checked?
7. Has overcurrent protection been installed to match the unit nameplate
requirement?
8. Have all set screws on the fans been tightened?
9. Does the fan rotate freely?
10. Does the field water piping to the unit appear to be correct per design
parameters?
11. Is all copper tubing isolated so that it does not rub?
12. Are air filters installed with proper orientation?
13. Have condensate drain and p-trap been connected?
Ambient Temperature
Ambient Dry Bulb Temperature ________°F
Ambient Wet Bulb Temperature ________°F