EasyManua.ls Logo

ABB 615 Series - Energizing the IED

ABB 615 Series
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.7 Energizing the IED
Before you connect the auxiliary power, check that the terminal strip is wired and
placed correctly.
During the start-up all LEDs are lit for a short period.
Green Normal LED starts to flash
LCD lights up and IED start-up is displayed
The main menu is displayed. A steady green Normal LED indicates a successful
start-up.
If the IED detects a diagnostic error during start up, the green Normal LED flashes and
the internal fault code is displayed on the LCD.
1MAC051065-MB C Section 5
Connecting
615 series ANSI 39
Installation Manual

Table of Contents

Other manuals for ABB 615 Series

Related product manuals