EasyManua.ls Logo

ABB A135-M55 - Page 55

ABB A135-M55
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / 4 Product description / A130-M.. - A145-M..
3 Commissioning / 3.2 Inspection procedures
© Copyright 2020 ABB. All rights reserved. HZTL4031_EN Rev.L July 2020
Version with water-cooled bearing casing
CAUTION
Failure of bearing casing cooling
Any prolonged failure of the water cooling will shorten the lifetime of the
turbocharger.
u Make sure that an uninterrupted supply of cooling water is provided dur-
ing operation.
u Check whether the water pipes are fitted on the bearing casing.
3.2.3 Checks after commissioning (engine in idle mode)
Lubricating system
u Keep to the lubricating oil pressure at the inlet.
u Keep to the lubricating oil temperature at the inlet.
u Refer to chapter Monitoring operation 27 for admissible values.
Leaktightness of pipes
WARNING
Risk of burning from hot gas
Escaping gases are hot and will lead to serious burns in the event of contact.
u Check all pipes for leaks in accordance with the enginebuilder’s instruc-
tions.
3.2.4 Checks when starting up the engine
If present:
u Measure speed, oil pressure and charging pressure at various engine performances.
u Measure the exhaust gas temperature before and after the turbine.
u Measure the air temperature before and after the compressor.
u Compare the measured values with the values of the acceptance report. Different operat-
ing conditions indicate a malfunction (see chapter Eliminating malfunctions 60).
Lubricants and pastes used during assembly can liquefy or vaporise and escape as oily fluids
during the initial hours of operation. Continual escape of an oily fluid indicates an oil leak. If
there is a leak, contact an ABB Turbocharging Service Station.
Page 25 / 114

Table of Contents

Related product manuals