EasyManua.ls Logo

ABB A135-M55 - A130 A135 A140 A145; Fig. 36: Dismantling the Gas Outlet Flange; Table 35: 3 Press-Off Screws

ABB A135-M55
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / 4 Product description / A130-M.. - A145-M..
8 Dismantling and fitting / 8.6 Removing the gas outlet flange
© Copyright 2020 ABB. All rights reserved. HZTL4031_EN Rev.L July 2020
Gas outlet flange with 3 press-off screws
CAUTION
Cracks in the gas outlet casing
Non-observance of the action steps described can lead to inadmissible
cracks on the gas outlet flange.
u Observe the maximum tightening torques when pressing off.
u Follow the action steps described.
Only dismantle the gas outlet flange if this is necessary for service work.
u If necessary: Treat the centering seat with rust remover through the press-off threads
and the clearance holes.
u Mark the casing position for assembly.
Fig.36: Dismantling the gas outlet flange
Product Press-off screws (strength 8.8) * Tightening torque
A130 3 x M 8 x 20 20 Nm
A135 3 x M10 x 25 40 Nm
A140 3 x M12 x 30 65 Nm
A145 3 x M12 x 30 65 Nm
Table35: 3 press-off screws
* not included in the ABB scope of delivery
1. Press off and remove the gas outlet flange (57002) with screws(01) according to the
table. If it is not possible to press off the gas outlet flange with the maximum tightening
torque, contact an ABB Turbocharging Service Station.
2. If present: Remove the C-ring(57003).
Page 74 / 114

Table of Contents

Related product manuals