105 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV. J
Preparing cables for cable entries with sealing
modules
1. Unscrew the frame and remove the sealing
modules.
2. Prepare the cables with an outer cable screen
for EMC bonding with the metal enclosure of
the cabinet as illustrated.
Preparing cables for cable entries with cable
glands
Prepare the cables with an outer cable screen
for EMC bonding with the metal enclosure of
the cabinet as illustrated.
!
For information on removing and install-
ing the sealing modules, see Appendix A
Additonal manuals.
References
6-11 Preparing control
cables for sealing
modules
6-12 Preparing control
cables for cable glands
6-11
Sealing module
Conductive foil
Cable sheath removed to expose cable shield
Conductor screen extension to be connected to PE terminal
1
2
3
4
1
2
3
4
6-12
Outer cable sheath
Cable gland
Conductor insulation removed to expose cable shield
Plate
Conductor screen extension to be connected to PE terminal
1
2
3
4
5
1
2
3
4
5