EasyManua.ls Logo

ABB ACS355 series - Hardware Configuration; Starting a New Project

ABB ACS355 series
139 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
45
Hardware configuration
In this example, a CPU 319F-3 PN/DP with integrated PROFIBUS DP and PROFINET IO interface is
used. An ABB ACS850 drive with FPBA-01 PROFIBUS DP module is connected to the PLC via the
PROFIBUS DP interface.
Starting a new project
1. In the main menu, navigate to File → New to start a new project.
2. Give name and location to the project.
Figure 3 New project
3. Right-click on the project and navigate to Insert New Object → SIMATIC 300 Station to insert a
station to the project.
Figure 4 New project
4. Expand the project tree, click the SIMATIC station and double-click Hardware.
The HW Config window is displayed.
Figure 5 Hardware configuration

Table of Contents

Other manuals for ABB ACS355 series

Related product manuals