EasyManua.ls Logo

ABB Aztec 600 - Page 72

ABB Aztec 600
109 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Aztec 600 aluminium, ammonia, color, iron, manganese, phosphate
Single- and multi-stream colorimetric analyzers 13 Maintenance
IM/AZT6CR–EN Rev. J 69
4. Referring to Fig. 13.7:
a. Note the routing of reagent tube R1 (recorded in
Section 13.3.4, step 4a).
b. Remove the spiral wrapping
G from the reagent
tube and level sensor cable
H.
c. Disconnect the tube from the level sensor
I and
withdraw the tube from the rubber boot
J.
d. Insert the new tubing through the rubber boot
J
and route the tubing into the analyzer as noted in
step a. Connect the tubing to the R1 connector on
the valve manifold K.
e. Refit the spiral wrapping G.
f. Cut the tubing to the required length and connect it
to the level sensor I.
g. Adjust the position of the spiral wrapping and rubber
boot as required.
h. Repeat steps a to g for reagent tubes R2 and R3.
Fig. 13.7 Replacing Reagent Tube
G
I
K
J
H

Table of Contents

Other manuals for ABB Aztec 600

Related product manuals