EasyManua.ls Logo

ABB Aztec 600

ABB Aztec 600
109 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Aztec 600 aluminium, ammonia, color, iron, manganese, phosphate
Single- and multi-stream colorimetric analyzers 13 Maintenance
70 IM/AZT6CR–EN Rev. J
13.3.6 Replacing the Piston Tube and Piston Assembly
1. Referring to Fig. 13.8, turn handle
A
1
/4 turn clockwise,
pull the analytical section forward and allow it to rest
against its stops.
2. Referring to Fig. 13.9:
a. Disconnect the measurement cell ribbon cable B
from the connector on the back of the measurement
cell.
b. Remove the four M4 screws C and remove the
measurement cell assembly.
3. Referring to Fig. 13.10, depress catch D and remove
cover E.
Fig. 13.8 Opening the Analytical Section
A
Fig. 13.9 Removing the Measurement Cell Assembly
Fig. 13.10 Removing the Measurement Cell Cover
B
C
E
D

Table of Contents

Other manuals for ABB Aztec 600

Related product manuals