EasyManua.ls Logo

ABB CM30 - Page 25

ABB CM30
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ControlMaster CM30 and CM50
Universal process controllers,
1
/4 and
1
/2 DIN 6 Basic Level
IM/CM/ED–EN Rev. B 23
…Basic
Loop 1 (2) Time Prop The active time of the output pulse is proportional to the value of the control output. With
100 % output the pulse is active for the complete cycle time, for example:
Note. Applicable only if Output Type is Time Prop or Split Output (and one output is a relay
or a digital output) – see page
24.
Cycle Time 1 The cycle time to be used with time proportioning outputs.
For split outputs this setting applies to Output 1– see page 24.
Cycle Time 2 The cycle time to be used with time proportioning outputs.
For split outputs this setting applies to Output 2 – see page 24.
Note. Applicable only if Output Type is Split Output.
Alarm 1 (8)
Trip The alarm trip level in engineering units. See Process Alarm (page 47) for parameter details.
Cycle Time
= 10 s
Cycle Time
= 10 s
Cycle Time
= 10 s
50 % Output 10 % Output 90 % Output
5 s 5 s 1 s 1 s9 s 9 s

Table of Contents

Related product manuals