EasyManua.ls Logo

ABB GOE 2600 - Page 21

ABB GOE 2600
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
21
2. Remove the M10 bolts (6), and then remove the
outer terminal (5).
G004691
3.
Place the lifting tool, lower part (1) around the
porcelain.
NOTE!
Make sure the rubber protection
protect the bushing.
G006984
4.
Close the lifting tool (1) and install the bolts.
NOTE!
Align the side of the lifting tool with the
oil-level guage (26).
G006985

Table of Contents