EasyManua.ls Logo

ABB GOE 2600 - Installation at Site; Preparations at Site

ABB GOE 2600
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
4. Remove the bolts (6), the washers (7) and the
lifting tool (1).
G006956
End of instruction
4.5 Installation at site
4.5.1 Preparations at site
Overview
This procedure is only applicable if the lower draw rod with the bottom contact (36) is installed in the
transformer.
G004532

Table of Contents

Related product manuals