EasyManua.ls Logo

ABB GOE 2600 - Installation of the Bushing on the Transformer at Site

ABB GOE 2600
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
39
9. Pull down the upper draw rod (35) from the
bottom end of the bushing.
G006755
10.
Remove the transport cover (45) from the
transformer (46) and the lower draw rod (4).
G005041
11.
Lift the bushing to a position above the installation opening on the transformer.
End of instruction
4.5.2 Installation of the bushing on the transformer at site
Procedure
1. Apply locking fluid on the threads (39) on the
lower draw rod (4).
If the bottom contact is removed from the
lower draw rod (4): apply locking fluid on the
threads (56).
Make sure that the guiding cone (62) is in
position.
CAUTION!
Make sure that all joints in the draw rod
are locked with thread-locking fluid.
NOTE!
Use thread-locking fluid grade 42 and
activator grade 47.
G005042

Table of Contents

Related product manuals