Operation Manual / 4 Product description / A130-H.. - A140-H
5 Operation and service / 5.2 Service work
© Copyright 2020 ABB. All rights reserved. HZTL4030_EN Rev.F February 2020
5.2.5 Other service work
If a protective grid is installed in the radial or axial gas outlet casing (61001) by ABB Turbo
Systems:
Fig.21: Replacing the protective grid
u Remove the protective grid (61205) after 50000 hours and replace it with a new one.
Pre-mix gas engines
CAUTION
Replace the protective grid of pre-mix gas engines after 20000 hours
Applications on pre-mix gas engines result in a high thermo-mechanical load
on the protective grid. To ensure proper functionality of the protective grid
even under these conditions, the protective grid of pre-mix gas engines
must be replaced after 20000 hours.
u Replace the protective grid of pre-mix gas engines after 20000 hours.
Page 35 / 93