EasyManua.ls Logo

ABB IRB 1200-7/0.7 - Page 765

ABB IRB 1200-7/0.7
906 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Screws: 3HAB3409-212 (M4x16).
xx1300002463
Place the motor at its mounting position and
fasten the attachment screws and washers just
enough to still be able to move the motor.
3
Note
Only use specified screws, never
replace them with other screws.
Securing the axis-5 motor and timing belt
NoteAction
For robots with protection type Clean
Room
1
For robots with food grade lubrication
For robots with protection type Hygienic
Clean the joints that have been opened and
wipe the parts free from particles with
spirit on a lint free.
xx1300002351
Refit the timing belt on the pulley.2
Note
Do not strech the timing belt too much!
Move the motor to a position where a good
timing belt tension is reached (F = 26 N).
3
Continues on next page
Product manual - IRB 1200 765
3HAC046983-001 Revision: S
© Copyright 2014 - 2021 ABB. All rights reserved.
4 Repair
4.6.7 Replacing the axis-5 motor with pulley
Continued

Table of Contents

Related product manuals