EasyManuals Logo

ABB PVS-100-TL User Manual

ABB PVS-100-TL
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
13
EN
(Continue to next page)
In case of use of “frame fixing brackets” (see side picture as
example) it will be possible to fix the bracket to the frame
structure without drill any additional holes.
Fix the bracket (03) to the support.

Lift the wiring box (02) up to the bracket using the optional
handles (04) or another appropriate lifting device.
Risk of injury due to the heavy weight of the
equipment.
Insert the heads of the two rear attachment pins (13) (placed
on the rear part of the wiring box) into the two slots on
the bracket. Check that the pins (13) has been correctly in-
serted in the slots as shown in the picture before releasing
the wiring box.
Remove handle or other lifting device (if used)

Insert the two gasket protective covers (contained in the in-
stallation kit) and slide them till the positioning pins are into
the proper bracket holes. If the mounting is correct the gas-
ket protective cover will have a locked position.
PVS
13
PVS
PVS

Other manuals for ABB PVS-100-TL

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB PVS-100-TL and is the answer not in the manual?

ABB PVS-100-TL Specifications

General IconGeneral
BrandABB
ModelPVS-100-TL
CategoryInverter
LanguageEnglish

Related product manuals