EasyManua.ls Logo

ABB PVS-175-TL - Page 54

ABB PVS-175-TL
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
54 Product manual - PVS-175-TL;A.1 Version
EN
Insert the two gasket protective covers (content in the “PVS-175 Installation Kit) and slide them till the
positioning pins are inserted into the proper bracket holes. If the mounting results correct the gasket
protective cover will have a locked position.
PVS
Lift the power module (01) up to the bracket (03) and over the wiring box (02), using the handles (04) or
the M8 eyebolts.
LIFTING – U Risk of injury due to the heavy weight of the equipment. Always consider the center
of gravity of the enclosures while lifting.
Insert the heads of two rear attachment pins (17) (placed on the rear part of the power module) into the
slots located on the bracket (03).
PVS
17

Table of Contents

Other manuals for ABB PVS-175-TL

Related product manuals