EasyManua.ls Logo

ABB REG670 2.0 IEC - Page 188

ABB REG670 2.0 IEC
268 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UL1
UL2
UL3
UN
UL1
UL1
UL2
UL3
I
E
D
T
E
S
T
S
E
T
I
E
D
IEC07000106-1-en.vsd
UL2
UL3
UN
1
2
IEC07000106 V2 EN
Figure 47: Connection of the test set to the IED for test of U1 block level
where:
1 is three-phase voltage group1 (U1)
2 is three-phase voltage group2 (U2)
3. Decrease slowly the voltage in phase UL1 of the test set until the START signal
resets.
4. Check U1 blocking level by comparing the voltage level at reset with the set
undervoltage blocking U1Low.
5. Repeat steps
2 to 4 to check U1Low for the other phases.
The connections to U1 must be shifted to test another phase.
(UL1 to UL2, UL2 to UL3, UL3 to UL1)
Check of U2Low
Procedure
1. Connect voltages to the IED according to valid connection diagram and
figure 48.
Section 12 1MRK502053-UEN B
Testing functionality by secondary injection
182 Generator protection REG670 2.0 IEC
Commissioning manual

Table of Contents

Related product manuals