EasyManua.ls Logo

ABB Relion 670 series - Page 73

ABB Relion 670 series
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 14: Rotor injection and IED connection X81
No Signal
1 Block injection, 220 V binary in
2 Block injection, 110 V binary in
3 Block injection, 48 V binary in
4 Block injection, Common binary in
5 Injection Blocked NC binary out
6 Voltage/Current Saturation NO binary out
7 Common binary out
8 Voltage A, analog out
9 Voltage B analog out
10 Current A analog out
11 Current B analog out
12 Voltage sense A
13 Voltage sense B
14 Current sense A (same as 16)
15 Current sense B
16 Current sense A (same as 14)
17 -
18 -
Table 15: Rotor injection connection X82
No
Signal
1 Injection (same as 3)
2 Injection, inside shunt resistor
3 Injection (same as 1)
4 Injection return (same as 5)
5 Injection return (same as 4)
Connect each signal connector terminal of screw compression type with one 0.5 to
2.5 mm
2
(AWG 24 - AWG 14) wire or with two 0.5 to 1.0 mm
2
(AWG 24 - AWG
18) wires.
Protective conductor terminal must be connected to the cubicle or station protective
earthing system. Electrical codes and standards require that protective earth cables
are green/yellow conductors with a cross section area of at least 2.5 mm
2
(AWG
14). The cubicle must be properly connected to the station earthing system. Use a
conductor with a core cross section area of at least 4 mm
2
(AWG 12).
1MRK 514 026-UEN B Section 6
Connecting
670 series 2.2 IEC 67
Installation manual

Table of Contents

Other manuals for ABB Relion 670 series

Related product manuals