EasyManua.ls Logo

ABB Relion 670 series - SECALARM Function Signals; SECALARM Basic Settings; About Security Events Logging

ABB Relion 670 series
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cc Cc
1)
External
Equipment (PC)
PE 1) 3)
2)
4)
IED
X1
1 65432
IED
1 65432
X1
4)
IEC13000229-1-en.vsd
3)
IEC07000141 V2 EN-US
Figure 45: Communication cable installation, 2-wire
Where:
1 The inner shields shall be connected together (with an isolated terminal block) and only
have one connection point in the whole system, preferably at the external equipment (PC).
The outer shield shall be connected to the IED chassis in every cable end. Use the shield
connection clamp at all IEDs. The first IED will have only one cable end but all others require
two.
2
Connect according to installation instructions for the actual equipment, observe the 120
ohms termination.
3 Connect the screens according to the installation instructions for the actual equipment.
4 Shield connection clamp, see Figure 30.
Cc Communication cable
1MRK 514 026-UEN B Section 6
Connecting
670 series 2.2 IEC 75
Installation manual

Table of Contents

Other manuals for ABB Relion 670 series

Related product manuals