EasyManua.ls Logo

ABB Relion 670 series - Event Types and GSAL Mapping

ABB Relion 670 series
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
External
Equipment (PC)
PE 1) 3)
2)
IED
1 65432
X1
4)
Cc
4)
IED
X1
1 65432
1)
1)
Cc
IEC13000230-1-en.vsd
3)
IEC07000142 V2 EN-US
Figure 46: Communication cable installation, 4-wire
Where:
1 The inner shields shall be connected together (with an isolated terminal block) and only
have one connection point in the whole system, preferably at the external equipment (PC).
The outer shield shall be connected to the IED chassis in every cable end. Use the shield
connection clamp at all IEDs. The first IED will have only one cable end but all others require
two.
2
Connect according to installation instructions for the actual equipment, observe the 120
ohms termination.
3 Connect the screens according to the installation instructions for the actual equipment.
4 Shield connection clamp, see Figure 30.
Cc Communication cable
Section 6 1MRK 514 026-UEN B
Connecting
76 670 series 2.2 IEC
Installation manual

Table of Contents

Other manuals for ABB Relion 670 series

Related product manuals