ABB | SACE Emax 2
142 | © 2013 ABB | 1SDH001000R0002 - L7804
Ekip Touch protection release | 17 - Test
Continued from the previous page
IMPORTANT: the zone selectivity commands work with:
Auxiliary power supply present.
Circuit-breaker open and, in the case of the withdrawable version, in
connected or test position.
Zone Selectivity
IMPORTANT:
The coil opening and closing commands work only with the release
powered by auxiliary power supply.
Make sure that the coils are connected to the power supply source.
The commands verify the operation of the release: eventual faults on Ekip
COM Actuator or the coils are not found by the test.
Test CB
Selecting the command Test CB opens a submenu containing the commands Open CB and
Close CB.
The commands allow you to activate coil opening and closing respectively: the correct sending
of the command is confirmed by a window with the message “Test Executed”.
The correct operation of the entire command system (release, Ekip COM Actuator and opening
and closing coils) is verified with the opening and/or the closing of the circuit-breaker.
NOTE:
The command Open CB is sent in the presence of a closed or open circuit breaker.
The Close CB is activated in the presence of an open circuit-breaker.
The command Zone Selectivity allows you to select the line you want to check: Protection
S or Protection G.
The following are available for each command:
Input, to check the state of the zone selectivity input.
Output force, to force the state of the zone selectivity output high.
Release Output, to release the override on the zone selectivity output.
Ekip Signalling
The submenus for testing the Ekip Signalling modules in the various versions 4K, 2K-1, 2K-2,
2K-3, 10K-1, 10K-2, 10K-3 allow you to send the command of Self-test.
The command activates an automatic sequence of test LED and contacts:
Phase Operation
1 Reset LED and output contacts .
2
Switch-on in sequence of all LEDs and the closing in sequence of all the
associated output contacts
3 Reset initial conditions
NOTE: with Ekip Signalling modules 2K-1, 2K-2, 2K-3, the sequence includes testing
of the LEDs of the inputs.
IMPORTANT: the self-test sequence involves the sending of the close command
of the output contacts: the check on the correct closing is the user's
responsibility.