Operation Manual / TPL65VA32/33
Maintenance
5
Cleaning the compressor du
ring
operation
5.3
Page 64
© Copyright 2015 ABB. All rights reserved.
September 2015 HZTL2464_EN Revision C
Screw in the sealing plug (X).
Push the valve activator (Y) against the spring and hold it for
10 ... 15 seconds until the entire volume of water has been injected.
After cleaning, wait at least 5 minutes to allow the turbocharger to dry.
NOTICE
If the cleaning operation is not satisfactory, it may be repeated up to
two times.
If the cleaning results are still not satisfactory after three attempts and
the engine values are also unsatisfactory, we recommend that you have
the turbocharger inspected and cleaned by an official ABB
Turbocharging Service Station.
Cleaning parameters per turbocharger compressor
Product
Engine load
Contents of water vessel
[dm
3
]
TPL65 50 … 85% 0.4

Table of Contents