Turbocharger VTR..4 Seite / Page 11
Inbetriebnehmen Kap. / Chap. 2 Putting into operation
ABB Turbo Systems Ltd
10030
- D -
ABB
4
Inspection during
putting into operation
Inspection work includes preventive visual controls,
as well as monitoring and measurement to ensure
the correct functioning of the turbocharger. These
serve as an aid for the recognition of deviations before
and during putting into operation in order to prevent
damage to the machine.
- Control and measurement checks must be carried
out at the listed inspection points at the intervals
quoted below.
- Before and during inspection work, the safety
instruc-tions cited (in chap. 1) must be observed.
4.1
Outline of inspection work
Inspection symbols and intervals
Inspection location
Inspection point
(visible in the outline)
Inspection point
(not visible in the outline)
Inspection
Recording of measurement values
Abbreviations for the inspection times
Before before putting into operation
After after putting into operation
4
Prüfarbeiten bei
Inbetriebnahme
Diese Prüfarbeiten sind vorbeugende Sichtkontrollen,
Überwachungs- und Messarbeiten, die die Funkti-
onsfähigkeit des Turboladers sicherstellen. Sie hel-
fen, Abweichungen vor und bei Inbetriebnahme zu
erkennen und dadurch Maschinenschäden frühzeitig
zu verhindern.
- In den unten angegebenen Zeitabständen sind an
den aufgelisteten Prüfstellen Kontroll- und
Messarbeiten durchzuführen.
- Vor und bei allen Prüfarbeiten sind die Sicherheits-
hinweise (in Kap. 1) zu beachten.
4.1
Übersicht Prüfarbeiten
Prüfsymbole und -zeiten
Prüfort
Prüfstelle
(in Übersicht sichtbar)
Prüfstelle
(in Übersicht verdeckt)
Prüfen
Messwerte erfassen
Kurzbezeichnung der Prüfzeitpunkte
vor Inbetr. vor Inbetriebnahme
nach Inbetr. nach Inbetriebnahme