EasyManua.ls Logo

Accu-Chek Guide

Accu-Chek Guide
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38
Control Tests
4
Performing a Control Test
You need the meter, a test strip, and control solution Level 1 or Level 2.
Check the Use By date on the test strip container.
Do not use test strips past the Use By date.
Remove a test strip from the test strip container.
Close the cap tightly.
1 2
Insert the metallic end of the
test strip into the meter. Place
the meter on a flat surface.
The meter turns on. Preparing
to test appears.
Apply drop appears.
3
54988_08100918001_EN.indb 38 9/30/16 5:04 PM

Related product manuals