INSTALLATION
10
INSTALLATION
Preparation of the System
Review “Pre-installation requirements” chapter above.
Unpack the water purification system and place it on the laboratory bench.
Remove the protective packing materials.
Introduction to John Guest tubing system
Adrona water purification systems are equipped with John Guest push-fit fittings and tubes. We will
use abbreviation JG for John Guest parts in further text.
To make a connection, the tube is simply pushed in
by hand; the unique patented John Guest collet
locking system then holds the tube firmly in place
without deforming it or restricting flow
Push the tube into the fitting, to the tube stop
Pull on the tube to check it is secure. Test the
system before use
To disconnect, ensure the system is depressurized,
push the collet square against the fitting. With the
collet held in this position the tube can be removed