ADS-tec OPC8008 - Cable Installation; Order of Steps During Commissioning; Check for Operational Readiness

Default Icon
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPC8000 series 38
© ADS-TEC GmbH • Heinrich-Hertz-Str. 1 • 72622 Nürtingen
Pos: 18 /Datentec hnik/Inbetriebn ahme/Reihenfolg e der Inbetrie bnahme/Reihenf olge der Inbetrie bnahme für VMT 60xx-Seri e @ 1\mod_1 222073159179_6. doc @ 4100 @
5.3 Cable installation
The interfaces and the device power supply plug are located at the bottom of the device.
5.4 Order of steps during commissioning
•24V DC device: insert cable for power supply with cable end sleeves into terminals
•Connect cable for serial / parallel data transmission and fasten the plugs to the sockets
•Plug in all other required cables and secure against slipping out.
Pos: 19 /Datentec hnik/Inbetriebn ahme/Betriebsb ereitschaft prüfe n/Betriebsbereit schaft prüfe n für OPC/CPC/PLC /OTC/ITC/VMT -Serie(+Mo nitore) / IPC 5 100/5500/2400/1 100 @ 0\mo d_115890557 8361_6.doc @ 3 81 @
5.5 Check for operational readiness
Check the device for hidden damages caused by improper transport, incorrect
operation/storage conditions or improper use (e.g., smoke emissions from the device, etc.). If
damages are found, immediately shut down the device and protect it against unintentional
startup.