C. PROCESS FLOW ADJUSTMENTS
1. Theoperatormustdetermineandsetproperwaterowrateforthemostefcient
and trouble free operation.
a. Waterowratethroughtheprocessisdeterminedbythepressurelosses
intheprocessloop.Generally,higherowratesresultinturbulentow
achieving maximum temperature control and lower maintenance. Since
theevaporatorinmostliquidchillersisowsensitive,theefciencyof
operationisdirectlyrelatedtotheowofliquid.
b. Maximumchillerefciencyisobtainedatapproximately2.4gpmper
tonofratedcapacity.Lowliquidowcanreduceefciencyandinsome
cases allow ice to develop in the evaporator which can damage the
evaporator.Excessiveliquidowwilltripthemotoroverloadprotection
circuit.
2. Turn the unit on to activate the process pump. Wait a few moments to allow air
to be purge from system. Observe the digital coolant pressure gauge for steady
readout.Checkunitforlowandhighow.
3. LOW FLOW
Ifalowowconditionispresent,besureallprocessvalvesareopen.Ifall
processvalvesareopenandalowowconditionsexists,considerthefollowing:
a. Lowowcancausethelowrefrigerantpressurelimitswitchtotrip.
b. Tooperateunderalowowconditionitisnecessarytoinstallaow
bypassintheprocesscircuitry.Thiswillallowaportionoftheowto