EasyManua.ls Logo

AeroWorks 50cc Pitts Python ARF-QB - Fin Installation

Default Icon
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
Fin Installation
1. Gather the Fin, Rudder and Hinges.
2. Mark cut lines on the covering were the bottom
of fin will glue to the top of the fuse.
Note: Cut lines should be thinner then the
thickness of the fin. This will prevent any
wood from showing after the fin as been
glued into place.
3. Using a hobby knife cut away covering to ex-
pose the wood at the top of the fuse for the fin to
securely glue too.
4. Put epoxy into the fin slot and top of fuselage.
Note: Test fit fin to fuse before gluing to ensure fin
is square to fuse.

Related product manuals