EasyManua.ls Logo

Agilent Technologies 1200 series - Page 38

Agilent Technologies 1200 series
150 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38 1200 Series Quarternary Pump User Manual
3 Installing the Pump
Installing the Quaternary Pump
6 Connect all capillaries, solvent tubes and waste tubing (see “Flow
Connections of the Quaternary Pump” on page 41).
7 Press power switch to turn on the module.
8 Purge the quaternary pump (see “Priming and Purging the System” on
page 44).
NOTE
The power switch stays pressed in and a green indicator lamp in the power switch is on
when the module is turned on. When the line power switch stands out and the green light
is off, the module is turned off.
NOTE
The pump was shipped with default configuration settings.

Table of Contents

Other manuals for Agilent Technologies 1200 series

Related product manuals