38 1200 Series Quarternary Pump User Manual
3 Installing the Pump
Installing the Quaternary Pump
6 Connect all capillaries, solvent tubes and waste tubing (see “Flow
Connections of the Quaternary Pump” on page 41).
7 Press power switch to turn on the module.
8 Purge the quaternary pump (see “Priming and Purging the System” on
page 44).
The power switch stays pressed in and a green indicator lamp in the power switch is on
when the module is turned on. When the line power switch stands out and the green light
is off, the module is turned off.
The pump was shipped with default configuration settings.