Introduction
Agilent 5100 and 5110 ICP-OES User’s Guide 17
2. Introduction
Site Preparation Requirements 17
User Documentation 18
Specifications 19
Electrical Power Supplies 19
Other Connections 20
Personal Computer Requirements 20
Gas Supplies 20
Exhaust system 21
ICP-OES instrument cooling air supply 21
Water Chiller System 22
Drain Vessel 23
Site Preparation Requirements
Prior to receiving your instrument, you will have been provided with
an Agilent 5100 and 5110 ICP-OES Site Preparation Guide, which
describes the environmental and operating requirements of the
ICP-OES system. You must prepare your laboratory according to
these instructions before the ICP-OES can be installed. You should
keep the Site Preparation Guide for future reference for example, if
you plan to move your instrument. If you have misplaced your copy,
you can obtain a free replacement from your local Agilent office.
Position the equipment for easy access to the disconnecting switch
on the left side of the instrument.