2-114 Power Loss
If power recovers while the drive is still in inertia ride through the power
loss alarm is cleared and it then accelerates at the programmed rate to the
set speed. Otherwise, if power recovers before power supply shutdown, the
power loss alarm is cleared.
If the drive is in a “run permit” state, the reconnect algorithm is run to
match the speed of the motor. The drive then accelerates at the programmed
rate to the set speed.