EasyManua.ls Logo

Alstom GL314 - Page 138

Alstom GL314
208 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
Replacing the operating device FK3--1
L51--800EN/04
12/12
04--2004
E ALSTOM
Reinflating the pole
DO NOT SUPPLY THE OPERATING MECHANISM MOTOR WITH CUR-
RENT TO AVO ID THE CLOSING SPRING BEING RELOADED.
THE CIRCUIT BREAKER MUST NOT BE OPERATED AT A SF
6
PRES-
SUREGAS LOWERTHAN THEMINIMAL PRESSUREFOR THEINSULA-
TION p
me
.
Process
To make this operation, refer to the modules :
S Calculation of the SF
6
gas filling pressure for using the pressure
gauge (tool)
S Filling with SF
6
gas

Related product manuals