Installation
Erectio n gen eral p rocedu res
T31--003EN/01
1/6
09--1998
E ALSTOM
Presentatio n
Introduction
During the erection of the circuit--breaker , some particular mounting or check-
ing operations will be realized.
In this module
This module contains the following topics :
Topic Page
Preparing and installing static seals 2
Screw sealing 3
Using a water pressure gauge 5