TRANSMISSION & DISTRIBUTION
High voltage switchgear
PS 0002/A 02 1996-03-18 1998-08-11 2 / 3
Sheet N° Revision 1st issue Revision date Page
SAFETY INSTRUCTIONS
PACKING
TRANSPORT
INSTALLATION
START-UP
OPERATION
MAINTENANCE
SCRAPPING &
RECYCLING
Handling operations must be carried out by personnel
familiar with the basic handling regulations.
XXXXXXX
Personnel must be qualified to operate lifting equipment,
cranes, overhead conveyors, etc..
XXXXXXX
Equipment in proper working order :
- Equipment must be checked and maintained regularly in
accordance with local regulations.
- All equipment must be properly housed.
XXXXXXX
Familiarity with the load to be handled (see details on the
case).
XXXXXXX
Use of the appropriate handling equipment :
- Type of sling(s),
- Correct slinging methods,
- Use of special ALSTOM handling equipment.
XXXXXXX
Follow the handling instructions on :
- the cases (pictorial symbols: centre of gravity, slinging
points, etc.),
- the assembly instructions.
XXX
Compliance with the relevant work station safety instructions
(proximity of electrical equipment).
XXXXXX
Operator Safety :
- use of gloves, helmets, safety boots, etc.,
- loads not to be carried with personnel underneath.
XXXXXXX