EasyManua.ls Logo

Alstom GL314 - Page 60

Alstom GL314
208 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Support--frame assembly
L31--113EN/01
2/6
06--2003
E ALSTOM
Components necessary for the operation
Necessary product
Grease MOBILPLEX 47 -- MOBILUX EP3 (screws greasing).
Necessary tools
List of the tools necessary for the installing :
Mark Diagram Designation Number
(1)
Lifting strap
(3 m)
2
Lifting equipment
Provide for appropriate lifting equipment :
(3,000 daN) (minimum)
H+2m
H
Handling
The support--frame assembly operations and lifting
the pole should be performed by at least two
per-
sons
.

Related product manuals