EasyManua.ls Logo

Alstom GL314 - Page 80

Alstom GL314
208 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Installing the op erating device
L31--789EN/01
8/8
01--2004
E ALSTOM
Permanent heating system
Process
Switchonthepermanentheatingsystemoftheoperatingdevice(inbothsum-
mer and winter) to avoid condensation, and the corrosion which might result
from this.
DO NOT SUPPLY THE OPERATING MECHANISM MOTOR WITH CUR-
RENT TO AVO ID THE CLOSING SPRING BEING RELOADED.
THE CIRCUIT BREAKER MUST NOT BE OPERATED AT A SF
6
PRES-
SUREGAS LOWERTHAN THEMINIMAL PRESSUREFOR THEINSULA-
TION p
me
.

Related product manuals