Page 19
STEP 11.
—
Start Up Pre-Checklist
Before starting your unit, check the following items:
INSTALLATION QUESTIONS:
☐ Was a proper bedding material used?
☐ Is chamber installed level?
☐ Was the proper amount and type of ballast used?
☐ Was proper backfill and compaction done
to support piping?
☐ Does the inlet location provide clear removal
of the pump?
☐ Are all penetrations through the pump chamber
wall sealed water-tight?
☐ Are all piping connections tight and required
valves installed properly?
☐ Has minimum of 500mm of water been put
into the tank?
☐ Has the vent been installed (if required)
☐ Verify all valves are open
ELECTRICAL QUESTIONS:
Before checking the following electrical questions, ensure
that the electrical installation has been carried out by a
qualified electrician to the necessary electrical codes.
☐ Are all of the cable glands tight?
☐ Are all wiring connections secured?
☐ Are all cables secured and clear of the pump?
☐ Is the control panel securely mounted?
☐ Is the control panel dry?
☐ Is the conduit entering the control panel correctly?
☐ Turn the circuit breaker in control panel to
“OFF” position
☐ Turn the circuit breaker in the household
breaker panel to the “ON” position
Figure 18: Sealing Basin Rim (if sealed separate vent must be used)
Installation of ‘O’ Ring Seal
‘O’ RING IF REQUIRED