STEP 11.
Start Up Pre-Checklist
Before starting your unit, check the following items:
INSTALLATION QUESTIONS:
Was a proper bedding material used?
Is chamber installed level?
Was the proper amount and type of ballast used?
Was proper backfill and compaction done
to support piping?
Does the inlet location provide clear removal
of the pump?
Are all penetrations through the pump chamber
wall sealed water-tight?
Are all piping connections tight and required
valves installed properly?
Has minimum of 500mm of water been put
into the tank?
Has the vent been installed (if required)
Verify all valves are open
ELECTRICAL QUESTIONS:
Before checking the following electrical questions, ensure
that the electrical installation has been carried out by a
qualified electrician to the necessary electrical codes.
Are all of the cable glands tight?
Are all wiring connections secured?
Are all cables secured and clear of the pump?
Is the control panel securely mounted?
Is the control panel dry?
Is the conduit entering the control panel correctly?
Turn the circuit breaker in control panel to
“OFF” position
Turn the circuit breaker in the household
breaker panel to the “ON” position
Figure 18: Sealing Basin Rim (if sealed separate vent must be used)
Installation of ‘O’ Ring Seal
‘O’ RING IF REQUIRED