INSTRUCTIONS FOR INSTALLATION AND MAINTENANCE
安装和维护说明手册
D0578-02-ZH
100/100
AREVA T&D S.p.A. – Via Meucci, 22 30020 Noventa di Piave (VE) ITALY – Tel. : 39 0421 309511 – Fax : 39 0421 65254
Subsidiary of AREVA T&D Italy SpA (AREVA group) with registered office in Via Meucci, 22 30020 Noventa di Piave (VE) - ITALY, under Art. 2359 of the Italian Civil Code.
ATTACHMENT "C": RECORDING FORM FOR COMMISSIONING OF SWITCHGEARS
附件 C: 开关设备调试记录表
Customer
....................................................................
S/S
.....................................................................................................
Order
.......................................................................
Equipment type
......................................................................
Serial No.
...............................................................
Wiring diagram DIN
DIN.......................................................
Installation drawing DIN
DIN.........................
Installation instructions
.......................................................
1) CHECKS:
Sign after test Remarks or measured values
Dimensional check according to installation drawing
1.1
S
Verification of verticality of installed insulators
1.2
R
Verification of correct installation of drive
1.3
R
Verification of correct installation of shafts and transmissions
components
1.4
S
Verification of alignment and coupling of fixed and mobile
contacts
1.5
2) TESTS OF OPERATION:
Sign after test Remarks or measured values
EE
Perform 5 manual operations and verify that the opening and
closing movements are correct
5
2.1
Perform 5 motor operations and check that the end positions
are correctly reached
5
2.2
Verify the correct signaling of the auxiliary contacts
2.3
3) CURRENT CONSUMPTION OF MOTOR: (Maximum value excluded the starting peak )
( ):
3.1 Perform 5 operations (C. O.) and write the average value of the result
s
5 (“ )
POLE
EARTHING SWITCH
( fixed contact side )
( )
VOLTAGEDISCONNECTOR
EARTHING SWITCH
( mobile contact side )
( )
OPENING
(A)
A
(A) (A) (A) (A)
CLOSING OPENINGCLOSING OPENINGCLOSING
4) CONTACT RESISTANCE OF MAIN CIRCUIT:
POLE RESISTANCE ENV. TEMP. CURRENT
(A) (A)
B
C
( )
B
C
A
( )
(
)
(A)
(°C)
(°C)
(°C)
(A)
(A)
4.1
Reference value..........
at 20°C, ±20 %
.............
20°C, ±20 %)
A
fter the above verifications we declare that, as far as we are concerned, the switchgear is suitable to be put in service.
Signature: ........................................................................Date: ..................................................................................