EasyManua.ls Logo

Areva S2DAT - Table of Contents

Areva S2DAT
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTRUCTIONS FOR INSTALLATION AND MAINTENANCE
安装和维护说明手册
D0578-02-ZH
2/100
AREVA T&D S.p.A. – Via Meucci, 22 30020 Noventa di Piave (VE) ITALY – Tel. : 39 0421 309511 – Fax : 39 0421 65254
Subsidiary of AREVA T&D Italy SpA (AREVA group) with registered office in Via Meucci, 22 30020 Noventa di Piave (VE) - ITALY, under Art. 2359 of the Italian Civil Code.
CONTENTS 目录
1. SAFETY INSTRUCTIONS 安全指引.......................................................................................................................... 6
1.1 SPECIAL SAFETY REQUIREMENTS 特殊安全要求 .......................................................................................6
1.2 GENERAL SAFETY REQUIREMENTS 一般安全要求 .....................................................................................7
2. DESCRIPTION 概述....................................................................................................................................................8
2.1 GENERAL 总论....................................................................................................................................................8
3. PACKAGING AND SHIPMENT 包装运输 ................................................................................................................ 9
3.1 TYPES OF PACKAGES 包装类型....................................................................................................................... 9
3.1.1 Shipping cases
装运包箱
...................................................................................................................................9
3.2 SHIPPING UNITS 系统装运单元......................................................................................................................... 9
4. RECEIPT AND STORAGE 验收和储存 .................................................................................................................. 10
4.1 RECEIPT 验收 .....................................................................................................................................................10
4.2 STORAGE 储存...................................................................................................................................................10
4.2.1 Short-time storage (less than three months)
短期储存(
3
个月以内)
.........................................................10
4.2.2 Long-time storage (longer than three months)
长期储存(
3
个月以上)
.....................................................10
5. UNPACKING AND LIFTING 开箱与吊运............................................................................................................... 11
6. INSTALLATION AND ADJUSTMENT 安装和调整 ..............................................................................................13
6.1 CONDITIONS AND PRELIMINARY OPERATIONS BEFORE INSTALLATION 安装前的情况和预备性
操作 ...............................................................................................................................................................................13
6.2 INSTALLATION OF THE SUPPORT STRUCTURES ON PILLARS 在柱子上安装支架结构 ..................... 14
6.2.1 Support structures on rectangular-section reinforced-concrete pillars (Fig. 4, 4A, 4B)
在矩形部分的钢筋
混凝土柱子上的支架结构(
4
4A
4B
.............................................................................................................14
6.2.2 Support structures on round-section reinforced-concrete pillars (Fig. 4, 4C, 4D)
在圆形部分的钢筋混凝
土柱子上的支架结构(图
4
4C
4D
....................................................................................................................15
6.3 INSTALLATION OF THE SINGLE-POLE S2DA DISCONNECTOR 单极 S2DA 离开关的安装.........................18
6.3.1 Lower base (Fig. 1, 5)
下底座(图
1,5)..........................................................................................................18
6.3.2 Rotary insulators (Fig. 1, 2D, 5)
旋转绝缘子(图
1
2D, 5
.....................................................................19
6.3.3 Mobile live part (Fig. 1, 2, 2A, 2B)
动过流部件(图
1
2
2A
2B
.......................................................20
6.3.4 Line terminal clamps (Fig. 2C)
端子连接夹
(图
2C
................................................................................21
6.3.5 Intermediate guide and upper section of the vertical drive shaft (Fig. 1, 4A, 4C, 7A)
中间导轨和垂直驱动
轴的上半部分(图
1
4A
4C
7A
........................................................................................................................22
6.3.6 Lower section of the vertical drive shaft and drive (Fig. 7, 7A)
垂直驱动轴的下半部分和操作机构(图
7
7A
..........................................................................................................................................................................23
6.4 INSTALLATION OF THE SINGLE-POLE S2DAT DISCONNECTOR 单极 S2DAT 隔离开关的安装 ........25
6.4.1 Lower base with earthing switch (Fig. 1A, 1B, 5A, 5B, 5D, 5E)
带有接地开关的下底座(图
1A
1B
5A
5B
5D
5E
...........................................................................................................................................................25
6.4.2 Rotary insulators (Fig. 1A, 1B, 2D, 5A, 5B, 5D, 5E)
旋转绝缘子(图
1A, 1B, 2D, 5A, 5B, 5D, 5E
.........26
6.4.3 Fixed contacts of the earthing switch (Fig. 9)
接地开关静触头(图
9
......................................................27
6.4.4 Mobile live part (Fig. 1A, 1B, 2, 2A, 2B)
动过流部件(图
1A
1B
2
2A
2B
....................................28
6.4.5 Line terminal clamps (Fig. 2C)
端子连接夹(图
2D
.................................................................................29
6.4.6 Earthing switches(Fig. 5A, 5B,5D,5E,8)
接地开关(图
5A
5B
5D
5E
8
........................................30

Table of Contents

Related product manuals