EN Power Focus 600
36
© Atlas Copco Industrial Technique AB - 9836 4954 01
Activating the Pset
1. Return to the list of Psets and go to the Pset you
just configured.
2. Press OK to activate the selected Pset. This will
enable the Pset and make it the default tightening
program. The option button for the selected Pset
will turn yellow when activated.
The controller is now set up to tighten the bolt to the specified target torque 30
Nm, using the default tightening strategy TurboTight.
Editing Tightening program name
{ , : profile5 in element [subsection]}
1. Use the UP ARROW key and go to the Pset name
box.
2. Press OK to edit the Pset name. Type the name
Basic tightening using the keypad, and then press
OK.
{ , : profile5 in element [p]}To enter letters, you
must for now use the web-interface and keyboard.
The controller’s edit functionality is not fully im-
plemented.
Advanced Tightening setup
{ , : profile4 in element [iosection]}
This tutorial will show how to configure the different behavoiurs with which
you can modify the tightening performance.
Scenario
By configuring the different stages Start, Rundown, Tightening and Stop.
Further specifications and real life scenario to be investigated together with
Adam.
Procedure
Batch sequence setup
{ , : profile4 in element [iosection]}
This tutorial describes how to setup and configure a batch sequence using a tool
together with a Scanner and a Socket selector. A batch sequence is a serie of up
to a maximum of four batches. Each batch is a specified number of times a
tightening is performed by using a certain Pset.
Required hardware Power Focus 500, Power tool, Scanner and Socket se-
lector.