EasyManua.ls Logo

ATV 250 - II. Inspecting Procedures

ATV 250
228 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
II.Inspecting procedures
1.Check
Front wheel:refer to “Tire inspection”and “Hub
inspection”of chapter2.
2.Measure
Radial run-out of front wheel:If exceeding the
specified limit, replace the front wheel or check
the bearing clearance(¢Ùin figure)
Attached:Rim run-out limit:
Radial run-out 2.0mm(¢Úin figure)
End face run-out 2.0mm(¢Ûin figure)
3.Check:
Tire surface:If worn or damaged, replace it.
Refer to “Tire inspection”of chapter2.
Install the tire according to direction ¢Ùof
“ROTATION”mark on the tire.
The tire assembly should be conducted on spe-
cial equipment. After replacing the tire, con-
duct curvilinear motion carefully. Must ensure
the tire on the correct position in rim. Other-
wise may cause damgage of motorcycle or
driver.
Warning
Caution
-78-

Table of Contents

Related product manuals