EasyManua.ls Logo

AUTOLIFT BB 1350 - Lift Installation Procedures

Default Icon
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
6
Lift
DEVICE
BB SKY BBW
MODEL
16
6.1 RECEIPT AND INSPECTION
On receipt of the lift, you must perform the following inspections:
- Check that the supply corresponds to the specifications ordered and the transport document.
- Check that the packaging is intact and that no parts have been broken or damaged during
transportation.
- Carefully check that the devices have not been damaged during transportation and that no parts
have been removed and/or tampered with.
- Check that all documentation necessary for installation has been provided.
IF THE DELIVERED DEVICE DOES NOT COMPLY WITH THESE
REQUIREMENTS, NOTIFY THE MANUFACTURER IMMEDIATELY.
6.2 STORING AND NON-USE OF THE LIFT
If the lift is not used, proceed as follows:
- Store the lift in a sheltered area away from atmospheric agents.
- All electrical / electronic parts must be kept wrapped to protect from humidity.
- The storage temperature must be between +5°C and +50°C.
- All sliding parts (guides, cylinders…) must be protected from dust and rust.
- Do not store for over 6 months. For longer periods of storage, before putting into service contact
the manufacturer to have the lift conditions inspected.
STORAGE OF THE LIFT IN CONDITIONS THAT DO NOT COMPLY
WITH THE ABOVE DESCRIPTION SHALL NULLIFY THE WARRANTY
FOR ANY PARTS TO BE REPLACED.

Related product manuals