Installation - Page 29
DECT - Installation Manual Page 29
38HBKD0001SAH – Issue 14 (27th October 2003) System Testing & Handover
System Testing & Handover
After completing installation and handset subscription, perform the
following checks:
– Make test calls from all handsets.
– With a call connected, move through the areas that should be covered
by base stations. Check that no unexpected 'black spots' exist.
Ensure that the customer is satisfied with the installation. Make sure they
are aware of the following:
– Reporting Faults:
Make the customer aware of the details required when reporting any
faults. Since this a cordless system, details of the handset user's
location at the time of a fault is crucial. Maintaining a record of the
location of faults may reveal black spots or high usage areas.
– Hearing Aids:
Make the customer aware that all cordless and mobile telephone
systems can cause background hissing on some hearing aids.
– Safety Areas:
Make sure the customer is aware of their responsibility to indicate to
handset users any areas where handsets should not be used and
should be switched off for reasons of safety. The 20DT handsets are
not classified as 'intrinsically safe electrical equipment' (a special
classification for electrical equipment for use in hazardous areas).