EasyManua.ls Logo

Azbil AUR355 - Loader Communication

Azbil AUR355
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Chapter 2. Wiring
z
If the system includes 3-wire devices only
Shield
Shield
Shield
Host device (master station)
Terminating resistor
SG
DA
DB
Terminating resistor
SG
DA
DB
SG
DA
DB
SG
DA
DB
This device or 3-wire device
(slave station)
This device or 3-wire device
(slave station)
This device or 3-wire device
(slave station)
Loader communication
To use the Smart Loader Package (SLP), connect the special cable between the
loader jack of this device and the PC running the SLP.

Table of Contents

Other manuals for Azbil AUR355

Related product manuals