Test Procedure
© b2 electronic GmbH DHV0086 Rev06 65
Step Procedure (Congureautomaticsequence)
AS10: Test Parameters – Voltage Steps
Specify the number of voltage steps to be
applied to the DUT.
Min. voltage levels: 1 Step
Max. voltage levels: 15 Steps
AS11: Test Parameters – Test Voltage
Specify test voltage for each step.
AS12: Test Parameters – Duration
Specify the test duration for each step:
Min.: 1 period
Max.: 500 periods
T = 1/f
The testing time depends on the frequency
chosen.
Note: When selecting Auto Frequency can
di󰀨erfromtheexpectedvalue.