34
PREPARING THE MACHINE | Switch On & Functional Check
• Check the connections to water/drain and electricity, and then
switch the machine on by lightly pressing the
On/Off
button.
• The functional check will start, the lights of the operator’s panel
hard buttons, the screen, the alarm indication light and the
buzzer will be tested first.
• The program version will be shown on the start-up screen, then
the treatment screen will be shown. Function check will appear
in the machine state indicator.
HC10139 |