EasyManuals Logo

Beijer Electronics X2 pro User Manual

Beijer Electronics X2 pro
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
Image and CODESYS update
5.3 iXDeveloperprojectstatusafter
panelimageupdate
On X2 pro, X2 extreme, X2 marine and X2 control, the iX Developer project is
unchanged after a panel image update is performed. If the panel image upgrade is
made over ethernet, an additional dialog will pop up to confirm an erasing of the
current iX Developer project. The default setting is not to erase the iX Developer
project.
5.4 UpdatingtheCODESYSruntime
usingethernet
To update the CODESYS Runtime, the folder containing the CODESYS
.cab-files listed below must be specified in the Image Loader utility. The exist
ing
Power Management- and EtherCAT DistributedClocksettingsareshowninthe
Image Loader utility, and can be set before updating the CODESYS Runtime.
BeijerElectronics, MAEN205G
22

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Beijer Electronics X2 pro and is the answer not in the manual?

Beijer Electronics X2 pro Specifications

General IconGeneral
BrandBeijer Electronics
ModelX2 pro
CategoryDC Drives
LanguageEnglish

Related product manuals